|
|
|
Location:
|
|
Tower Semiconductor LTD (Previous National Semiconductor) |
Customer: |
|
Tower Semiconductor LTD (Previous National Semiconductor) |
Period: |
|
1986-1987 |
Description: |
|
UPW system in Tower FAB1 |
|
|
|
Location: |
|
Tower Semiconductor LTD (Previous National Semiconductor) |
Customer: |
|
Tower Semiconductor LTD (Previous National Semiconductor) |
Period: |
|
1986-1987 |
Description: |
|
Waste system in Tower FAB1 |
|
|
|
Location: |
|
Tower Semiconductor LTD |
Customer: |
|
Christ |
Period: |
|
2002 |
Description: |
|
UPW system |
|
|
|
Location: |
|
Tower Semiconductor LTD |
Customer: |
|
Christ |
Period: |
|
2002 |
Description: |
|
Waste system |
|
|
|
Location: |
|
Tower Semiconductor LTD |
Customer: |
|
Meissner Baran |
Period: |
|
2005 |
Description: |
|
UPW system enlargement |
|
|
|
Location: |
|
Tower Semiconductor LTD |
Customer: |
|
Christ |
Period: |
|
2005 |
Description: |
|
New anion exchanger TOWER FAB2 |
|
|
|
Location: |
|
Intel, Kiryat Gat, FAB28 |
Customer: |
|
M.W.Zander |
Period: |
|
2007 |
Description: |
|
Drain systems on the trestle: AW, HFW, CCW, C4CMW, C4DMW, SCW |
|
|
|
Location: Towerjazz Semiconductor LTD
Customer: Towerjazz Semiconductor LTD
Period: 2015-17
Description: Roll in and installation of new equipment, supply and installation of pipes, fittings, valves and supports
|